BP Secrets & lies- Stop the Oil Flow!
On May 18, after much browbeating for the past three weeks over the oil well damage cover-up; BP finally released video of the “only source” of the Gulf oil spill at the wellhead preventer. The new video itself demonstrates misrepresentation and deception of the reported three leaks. The only video of the wellhead preventer is set in small frame and labeled as a riser leak and the riser which is lying on its side is alluded to be the “source of oil” with a recovery boom attached. This is gravely laughable, the 18 inch riser pipe is shown with a ¾ inch tube “siphon” that is red hot and could not possible be used to transfer a large quantity of oil a mile up to a ship! The inset video of the smaller third leak is alluded to be coming from the preventer after the “siphon” cut down on the flow. This is outrageous! The video is careful not to show the base of the wellhead and it may be ruptured and be leaking also. This new evidence from the main wellhead leak has pushed the oil gusher to an estimated 95,000 barrels a day, a far cry from BPs 5,000 barrels a day estimate. It is amazing that BP has managed to pull off this media charade for a month now with no questions asked by the mass media. http://www.energyboom.com/policy/breaking-new-underwater-footage-oil-leak-siphon-place BPs maneuvering with Big Bell and Top Hat plus the masquerade salvage siphoning at the end of the fallen riser is nothing more then “doing something” with the leak they showed us while stalling for time. Their actions do not address the main issue of stopping the flow of oil at its source (not shown until now) and capping the well permanently. BPs last resort Junk Shot proposal is ridiculous and stands a high risk of splitting the wellhead wide-open resulting in a greater flow and disaster. This is right out of Big Oils company playbook: secrecy, stall for time, public relations, litigation protection and maintaining image with owned media, government and puppet Congress members to do their bidding. There is a way to seal the wellhead with known Marine Pile Driving Technology. By lowering a larger pipe (3 feet in diameter) over the preventer and wellhead; they can be sealed to the ocean floor. I defy any “expert” in Heavy Marine Construction to explain to me why this will not work. It will take 83 sections of welded 60’ pipe and 80 valves to get to 5,000 feet in depth and as the pipe is hammered into the sea floor it will seal the preventer, wellhead and the end of the open riser and the oil will be contained permanently inside the pipe. The pipe and wellhead can then be permanently sealed from the surface and the pipe can be cut off far below the water surface. This can be accomplished in a few days. We need a STOP THE OIL FLOW TASK FORCE today that is independent of BP command to permanently stop the flow of oil tomorrow. This independent task force of FBI, Corps of Army Engineers, scientist and private marine construction contractors would begin taking positive action to permanently stop the oil flow. Three months from now, with the oil flow unchecked, (hurricane season) the ecological and economic burden will be so great that the United States of America will be catastrophically bankrupt. This ecological and economic genocide should be responded to as a terrorist attack against the American people and our Democracy. The New World Oder Totalitarian agenda of chaos by World Bankers and Big Oil is on schedule and world governance, by economic default, will be fully enacted by the end of the year- unless we fight for our Democracy now. Don’t bother calling Obama, he conveniently refuses to take command from BP, call your representatives in Congress today and demand that action be taken today by forming a independent Stop The Oil Flow Task Force to begin positive action to permanently stop the oil flow tomorrow. http://www.senate.gov/general/contact_information/senators_cfm.cfm http://clerk.house.gov/member_info/mcapdir.html
|
News
|

